“The spring report numbered every drain and put a photo beside each one. I sent it to our board as it came.”
Commercial roofing, Toledo and northwest Ohio
Flat roofs, surveyed twice a year and kept dry.
TPO and PVC roofs for the people who answer for the building. We install them, repair them and survey them on a schedule, so a leak is a line in a report before it is a stain on a ceiling.

- Report a leakBuilding type, location, a photo
- Call the office(419) 555-0100, weekdays 7 a.m. – 5 p.m.
- Text a photo(419) 555-0101
- Client portalReports, contracts, invoices
Contract customers reach the leak line at any hour. Everyone else: weekdays, 7 a.m. to 5 p.m.
The buildings we roof
Large, low-slope roofs over people who are still working
Every building has its own hours, tenants and rooftop equipment. We plan the roof around them.
Warehouses and distribution
Big roofs with dock canopies, curbs and rooftop units. We stage tear-off and material by section so the docks keep moving.
Retail and strip centers
Tenants under every bay. Noisy work is scheduled around opening hours, and walkways stay covered and clear.
Schools and churches
Work set for breaks and weekends, with a written site plan for the grounds and the people on them.
Apartments and condominiums
Notices to residents, access to rooftop equipment and a clear plan for each phase of the roof.
Offices and medical
Quiet hours, dust and odor controls near air intakes, and a schedule that holds.
Industrial and manufacturing
Roofs over process equipment, with exhaust and chemical exposure in mind when we choose the membrane.
Two membranes
TPO or PVC: how we choose
Both are single-ply membranes with heat-welded seams. The building decides which one goes on it.
| PVC | TPO | |
|---|---|---|
| Best fit | PVCRoofs under kitchen exhausts, labs and process vents | TPOGeneral roofs: warehouses, offices, schools, retail |
| Seams | PVCHeat-welded | TPOHeat-welded |
| Grease, oils and chemicals | PVCMade to resist them | TPOExposure shortens its life |
| Cost | PVCUsually higher | TPOUsually lower |
| Service life | PVCRoughly 20 to 30 years, by system and upkeep | TPORoughly 20 to 30 years, by system and upkeep |
The survey report
A report you can hand to your board
Twice a year a surveyor walks every square of the roof. You get a plan with numbered findings, photos, a rating for each and a repair list in priority order.
A roof plan with numbered findings
Each drain, curb, seam and edge has a number you can find on the roof.
A photo log tied to the plan
What we saw, where, and how it changed since the last survey.
A rating for every finding
Watch, repair soon or repair now, in plain words.
A repair list and the next visit
Priorities in order, and the date the surveyor returns.

A year on contract
Four visits, in the order the weather asks for them
- 01
Step 1: Spring survey
After the freeze and thaw: seams, flashings, edges, drains and any standing water. Report and photos to you.
- 02
Step 2: Repairs and drain clearing
Small defects found at the survey are fixed on the next visit, as your contract says. Larger work is bid on its own.
- 03
Step 3: Fall survey
Before the leaves and the first hard freeze: drains cleared, flashings and rooftop curbs checked, report to you.
- 04
Step 4: Winter standby
Contract customers can reach the leak line at any hour, and heavy snow or a hard thaw triggers a drain check, as written in the plan.
On the record
What we carry, in plain words
Ohio has no state roofing license, so we show what is on record: our registration with the city and our insurance. The numbers are in the footer of every page.
Registration
Roofing contractor registration
OH Registration 000000 · City of Toledo
Registered to roof in the city; permits pulled where required
Insurance
Workers' compensation
Ohio Bureau of Workers' Compensation · Policy 000000
Certificate sent on request
General liability
Carrier named on the certificate · Policy 000000
Certificate sent on request
From facility managers
What the reports are for
“A re-cover over our dry roof saved the tear-off. They took core samples first and showed us the results before they bid.”
“They worked the school roof in sections over the summer break, and each section was closed up before they left for the day.”
Sample reviews.
Where we work
Toledo and the counties around it
Crews drive out from the Tremainsville Road yard. We bid only what we can survey and answer for.

Lucas County
- Toledo
- Maumee
- Sylvania
- Walbridge
- Holland
- Waterville
- Whitehouse
Wood County
- Perrysburg
- Rossford
- Northwood
- Bowling Green
Fulton County
- Swanton
Monroe County
- Temperance
- Monroe
We don't roof in Detroit, Cleveland, Columbus or Fort Wayne. If your building is outside the area, we say so on the first call.
Questions we hear
Before you ask for a bid
How long does a TPO or PVC roof last?
Roughly 20 to 30 years, depending on the system, the building and how the roof is looked after. Many manufacturers expect documented maintenance before they honor a warranty, which is what the surveys provide.
Can you roof over the old membrane?
Sometimes. A re-cover over a dry, sound roof can save the tear-off. We take core samples and scan for moisture before we say so, and a wet roof gets torn off.
How do you work around our tenants?
We plan the roof in sections, schedule noisy work around your hours and close up each section before the crew leaves. Your bid lists the plan.
What do you need for a bid?
The building's address, the roof area if you know it, its age, and any drawings or past reports. Then a site visit, and the bid is written.
Is a care plan insurance?
No. It is a service contract for surveys, reports and priority leak response. It does not pay for damage, and it is not a roof warranty.
Start with the building
Request a roof survey or a bid
Tell us what kind of building it is and what you need. A person from the office calls you back.
- Monday – FridayToday
- 7 a.m. – 5 p.m.
- Leak line, contract customers
- Open 24 hours